          702Epoxy zinc-rich shop primer

          Product introduction

          Form :
          Main characteristics :
          Purpose :
          Appearance :

          Composition of zinc powder, epoxy resin and polyamide curing agent composed of two-component epoxy zinc-rich shop primer.

          Key Features

          • Zinc powder has a cathodic protection, excellent anti-rust performance, 20μm dry film maintenance period of about nine months

          • Dry fast, only a very short period of time that can transport, stacking and painting after painting

          • Has good heat resistance, welding cutting area is small

          • Excellent adhesion and impact resistance

          • Excellent abrasion resistance

          • Good oil resistance, water resistance and solvent resistance

          • The film thickness is within the specified range and does not affect the welding performance

          • Compatible with most paint systems

          • Type approval by China Classification Society

          Uses Used in workshops, heavy machinery plants, steel plants and other pretreatment lines for shop primer, the maintenance period of about nine months

          The appearance of gray no light

          Construction parameters Volume solids 53 ± 3% (according to GB / T9272 eqv ISO3233: 1998 requirements) (after mixing)

                        Component A: Component B = 91: 9 (weight ratio)

                        Dry film thickness 20mm

                        Wet film thickness 38mm

                        Theoretical amount of 89g / m2

                        Flash point A (base material) 5 ℃

                                      Component B (curing agent) 5 ℃

                        Curing time (after mixing) (25 ℃) 30min

                        Drying time (25 ℃)

                        Table dry ≤ 5min

                        Hard work ≤ 24h

                        Fully cured 7d

          Pipeline drying time (preheated steel 50 ℃, bake temperature 120 ℃) ≤ 5min

          The recommended number of coating Road 1, dry film thickness of 15-20m.

          After the road supporting the paint and chlorinated rubber, epoxy, epoxy asphalt, asphalt, epoxy ester systems supporting the use of coatings but not with oily, alkyd, polyester paint used in supporting.

          SURFACE TREATMENT • Steel is sandblasted to Sa2.5 with a surface roughness of 30-75 μm

          Construction conditions • Substrate temperature should be above 3 ℃ above dew point

                            • When the temperature is lower than 5 ℃, curing reaction of epoxy and curing agent is stopped, and it is not suitable for outdoor construction.

                            • Relative humidity not more than 85%

          Coating method

          Airless spray

                    Thinner 106 Thinner

                    Dilution 0-10% (by weight of paint)

                    Nozzle diameter 0.4-0.5mm

                    The discharge pressure was 15 MPa (about 150 kg / cm2)

          Air spraying

                    Thinner 106 Thinner

                    Dilution 0-10% (by weight of paint)

                    The nozzle diameter is 2.0-2.5mm

                    Air pressure 0.3-0.6MPa (3-6kg / cm2)

          Roll coating / brushing

                    Only small area repair

                    Thinner 106 Thinner

                    Dilution 0-3% (by weight of paint)

          Cleaning agent 103 Thinner

          Safety precautions Refer to the MSDS.

          Precautions 

                      • Zinc-rich primer can form zinc salts (ie, basic zinc carbonate, also known as white rust) after prolonged outdoor exposure and should not be exposed for long periods of time before painting. If the coating interval is longer, it is recommended as soon as possible after the sub-forming coating anti-rust paint to reduce the amount of the work of the second derusting

                       • No salt will form on the surface of the paint for a few months in a clean room environment or for 14 days in a clean outdoor environment. But in the industrial atmosphere or marine climate environment, will soon produce zinc salt, so after painting the interval after the paint should be shortened as much as possible

                       • In the case of zinc salts, the secondary degreasing treatment shall be carried out by means of a cleaning grade sandblasting or a mechanical descaling method, and all debris shall be removed

                       • Dry spray is prone to occur during high temperature seasons. In order to prevent the phenomenon of dry spray generation, dilution must be diluted to dry spray so far

          Packing group A (base material) 20L barrels 32.5kg

                           Part B (curing agent) 4L Bottled 3.2kg

          Shelf life of 12 months

          Remark For the correct use of our products, please carefully read the "User's Guide" in this manual.

          Statement The above data and data are based on our test and practical experience in the use of accumulated and can be used as construction guide. We do not understand the situation in the construction, we only guarantee the quality of the paint itself, other issues will not be responsible. For this manual, we will be based on the continuous improvement of products have the right to modify.


          If you have questions, you can:

          Or leave a message for us.

          Related recommendation
          Online Service

          Hotline

          0550-7911368

          在线电影播放,奇米第四包,日本一区二区精品视频,一级按摩片A一级按摩

              <address id="9hx9l"></address>
              <form id="9hx9l"></form>
                <form id="9hx9l"></form>

                <form id="9hx9l"></form>