<address id="9hx9l"></address>
      <form id="9hx9l"></form>
        <form id="9hx9l"></form>

        <form id="9hx9l"></form>

          Back

          B06-1 iron red acrylic primer

          Product introduction

          Form :
          Main characteristics :
          Purpose :
          Appearance :

          Product composition: from thermoplastic acrylic resin, red iron oxide, such as anti-rust pigments, physical pigments, additives and solvents from the preparation.

          Product performance: good adhesion, anti-rust, acrylic and other surface paint with good adhesion.

          Usage: black metal backing rust.

          Construction parameters:

          Specific gravity: about 1.25g / cm3

          Theoretical dosage: 120g / m2

          Wet film thickness: 60 μm

          Dry film thickness: 25 μm

          Drying time: Surface dry 0.5 hours, hard work 6 hours (23 ± 2 ℃, relative humidity 55 ± 5%)

          Maturation time: open evenly after mixing can be used.

          Painting interval: more solid paint prevail Road, the general interval of 24h.

          Construction Reference:

          Proposed Painting Road: 1-2 Road (according to the actual requirements to determine the number of construction Road).

          After the Road supporting coatings: colored one-component acrylic finish.

          Surface treatment:

          Be coated surface must be removed water, oil, rust and so on;

          There are oxide steel, sandblasting to Sa2.5 level;

          No oxidation of steel, pneumatic, electric or manual grinding to Sa3 level.

          Substrate temperature: substrate temperature must be higher than the dew point above 3 ℃, to prevent condensation of water vapor in the steel surface.

          Construction methods: spraying, brushing, roller coating

          Thinner: XB-2 acrylic acid thinner;

          Dosage: 0-15% or as appropriate.

          Safety measures: In a narrow space or limited space construction, ventilation and other protective measures must be strengthened, and open flame is strictly prohibited.

          Packing: 25kg / barrel

          Shelf life: 12 months under the specified conditions.

          Note: For correct use of this product, please carefully read the instructions.

          Disclaimer: The above information and data is accumulated in the experimental conditions and actual use, and can be used as a construction guide. We only guarantee the quality of the paint, for this manual, we will be based on the continuous improvement of products are subject to change without notice.


          If you have questions, you can:

          Or leave a message for us.

          Related recommendation
          Online Service

          Hotline

          0550-7911368

          在线电影播放,奇米第四包,日本一区二区精品视频,一级按摩片A一级按摩

              <address id="9hx9l"></address>
              <form id="9hx9l"></form>
                <form id="9hx9l"></form>

                <form id="9hx9l"></form>